Gladwin Hotel Project -Nungua, Accra
Tekton was commissioned to redesign this 100 room hotel and come up with a concept that would appeal to both local and international clients. Project is on-going.
Project Cost: $ 18.00 million
- Status: Under Construction
- Contractor: Self Build by Client
- Quantity Surveyors: Coins Consult
- Structural Engineers: Ing Dr. Patrick Bekoe
- Mechanical Engineers: Synergy MEP
- Electrical Engineer: ARQ Solutions Engineering

